migrate next gen project to classic jira. csv from next-gen and then import it to classic, i've faced with issue that epics doesn't include the tasks/stories. migrate next gen project to classic jira

 
csv from next-gen and then import it to classic, i've faced with issue that epics doesn't include the tasks/storiesmigrate next gen project to classic jira  Select Move Issues and hit Next

Bulk move the stories from NextGen to classic. I am looking for a solution to migrate the Next-Gen project or Team-managed project from one cloud instance to another. While schemes. Projects have opened in both Next-gen and Classic templates. Ask a question Get answers to your question from experts in the community. Our developers work from a next-gen project. Now, when you are moving epic(s) from a classic to a next-gen project (or vice versa), you would get a prompt asking if you would like to move the child issues along with the epic(s). I'm trying to migrate our Classic projects over to Next-Gen, however there seems to be no way to assign a Project Type or Description to a Next-Gen project. Ask a question Get answers to your question from experts in the community. Workaround. I want to migrate a NextGen project to Classic; however I see that NextGen is using a field called "Story Point Estimate" while classic is using "Story Points". Create . Hello, Is it possible to change/convert next-gen Jira project to classic? Products Groups Learning . I'm trying to migrate our Classic projects over to Next-Gen, however there seems to be no way to assign a Project Type or Description to a Next-Gen project. Context: We are planning to migrate a next-gen, team-managed project to a classic, company-managed project to enable more features for the customer. Atlassian could provide some migration tool! ThanksCreate an Epic in a Classic project; Link 2~3 issues from the Classic project in the created Epic; Move 1 issue to a Next-Gen project. Search for issues containing a particularly fix version (or versions) via JQL. Project admins can learn how to assign a next-gen. If you're using Jira next-gen projects, support for JQL behaves differently compared to classic Jira projects. Jira User: A next-gen Jira user has the same role as a classic Jira user, they can create tasks, edit and work on issues. Ask the community . Rising Star. Is there anyway to change the project type form Next-gen software to classic type as lot of classic features are not available in the Next-gen type? Products Groups Learning . The values don't come over. . Classic has the option to setup automation with Automation and Project Automation, but Next-gen only has the option for Automation. Or, if you would like you can "move" all the issues inside "next gen" project to the Kanban one (you can search for all issues and move all results at once) Thank you @Jack Brickey for the link. NG-2 -> OLD-100; View a board on. However, for now, they don’t provide a way to import a JSON or CSV file to these Next. For each attachment, the log file says, " INFO - Attachment 'overlap issue. You can select Change template to view all available company-managed. In the left panel, locate the Import and Export category, and select Migrate to cloud. If it's a Next-Gen project, it will have the Features option: If you don't see Features in Project. Next-gen: Epic panel in backlog You can now manage epics on the backlog of your next-gen project via the Epics panel, similar to how epic management works in classic Jira Software projects. Dear All, Is it possible to migrate a next-gen project to classic project? Thanks a lot, Gianmarco. Learn how to migrate users and groups with Jira Cloud Migration Assistant. Actual Results. We could move this into Jira as a custom field but from what I understand now, with the next generation, this Jira level field cant be brought into the projects. A new direction for users. . 3. 2 - Follow the guide below to migrate your next-gen project issues to a Classic project: Migrate between next-gen. Let us know if you have any questions. Create . Create . In the top-right corner, select more ( •••) > Bulk change all. Hello, I'm switching our project from Next Gen to Classic. Click the issue and click Move. In the upper right hand side, click on the "Advanced Search" link. Since then, many of. Either you as a Jira Admin or the Next-Gen Project Admin can do this: On the Next-Gen project, go to Project Settings > Access. Since you are mentioning recreating the fields i will assume that you are working with at least one next-gen project. I don't think it's mature enough to be in the market and frankly if there were a convenient way to migrate away from Jira entirely I would do so. It enables teams to start clean, with a simple un-opinionated way of wo. For this scenarios, Jira states: Users should query on next-gen epics using the parent =. The customer can create a custom issue type Sub-task, however, this does not solve the purpose of it. Products Groups Learning . Thanks for the answer, I was hoping I won't have to create the 100+ epics into the old generation project but I will do this. I have reached an impasse when I am requested to select the project I am moving to as well as t he issue types (see image below). Changes you make in the panel on the backlog will reflect on the Roadmap, and vice-versa. Before I migrate our issues over to the new classic board I wanted to test it out before moving my team over. Jira nexgen projects are designed to optimize locally (more team flexibility) at the cost of sub-optimizing (in a big way) globally. Please note that in some cases not all fields can be cloned. There is a need to move a Next Gen project to Classic project. Python > 3. Will our TM4J test cases associated with that project move with the rest of the records? If yes, will those test records/customized fields be impacted by this transfer?. See all events. For future changes you can move issues between a nextgen and classic project, so whatever you decide, you can quite easily move all issues at a later stage. You can now manage epics on the backlog of your next-gen project via the Epics panel, similar to how epic management works in classic Jira Software projects. I want to migrate to classic because I'm deeply dissatisfied with the "next-gen" product. Steps to reproduce. This is managed by agents. Hi @Joe G, Next-Gen projects don't use custom fields globally across projects like classic projects, that is why you don't see a "field scheme. There is a feature suggesting a migration tool for classic to next-gen: Migration tool from classic to next-gen project; For more details about what data is lost when migrating from one project type to another, please check the documentation below: Migrate between next-gen and classic projectsLearn how to migrate users and groups with Jira Cloud Migration Assistant. 4) Convert a Project to Next-Gen. . Have logged time show up in the Worklogs. Workaround. I started with 83 issues and now on the new board, I have 38. The JSON import will respect the "key" tag and number it. Try this to bulk move in the Next Gen version: Go to the project with the tasks you want to move. They don't require any setup or configuration from a Jira admin, so they're perfect for teams who want to work quickly and independently. I suspect that we are going to have to migrate the Next-gen projects to Classic templates. Create a Custom Field to hold the "old" creation date. Ask the community . Most of the. Here's a few things to consider when you migrate from a next-gen software project to a classic software project: Board statuses: If you customized your next-gen board, you'll need to set up the same statuses in your classic project's workflow. Subtasks are enabled, and I do have the option to add a subtask to an issue in a classic project, but cannot figure it out in a Next-Gen project. 1. Next-gen is nearly unusable and an embarrassment for such a large and resourceful company. In fact, the sub-task functionality is a relatively new feature in next-gen (It was implemented two months ago as you can see in this link), so I believe our developers will be adding further improvements to it in the next months. Here's what I see as the important details. There are better tools available than "next-gen" that are cheaper and faster than Jira. Issues that were in the active sprint in your classic project will be in the backlog of your next-gen project. I do want to stress out that next-gen is limiting in a positive way, if you want to go back to the foundation of Scrum, or any other Agile framework. Services. Dependency. Once you have cloned the epic, go to the cloned one and again click the ellipsis and this time select Move and then move it to your next-gen project. This is. Hi @Jenny Tam . 3. i would like to switch back to classic. Select Projects. . Bulk move issues into their new home. Here the UI gives the impression that you can actually change the Task to a Subtask and choose a. Anyway, my question is: Is there a way to copy issues from a next-gen project back to Classic but keep the roadmap in tact? I see where I can migrate the issues back to classic but I do not want to lose all the work the. Then, delete your next-gen projects. Is it poss. OR have a better communication around this so user. What you need to do is export the old project issues into JSON, edit the issue keys to reflect the new project key, then JSON import. Is this possible? I cannot create a new board in the project with Next-Gen? I started the Nex-Gen project a month ago and then I noticed that we are. Products Groups Learning . There's a page on Atlassian's documentation that covers the bulk move process for next-gen to classic. The customer does not have an option to add an issue type: Sub-task in the current set of Next-gen projects. 2. 3 - Can you confirm if all the Next-gen issues can reproduce this problem? Did they got migrated from Classic projects? Let us know if the steps above helped. Is there a way to migrate next-gen project to classic projects in bulk? Two years ago we started using Jira Cloud and I didn't really know what I was doing at the time and didn't really understand the difference between these two types. When generating your backup, if there are any next-gen projects in use, it will ask you to move these issues to a standard project. Watch. Jira Software Cloud; JSWCLOUD-18112; Migrating Jira Next Gen Project to Classic needs to introduce drag and drop feature. Like Be the first to like this . I was also looking for a solution for the Classic Project, The next-gen project roadmap would be good enougth. Migrating issues is possible between all Jira project types (company-managed, team-managed, software, JSM). Select Move Issues and hit Next. what permissions we need to do the same. I believe the best way to transition your issues from a Next-gen to a Classic board keeping the custom fields would be by exporting and importing the next-gen issues to a Classic project using CSV format. Jira; Questions; Move a project from team managed to company managed;. Jira ; Jira Service Management. You can use Deep Clone as a tool to migrate thousands of issues to another project or instance. djones Jan 18, 2021. Features for next-gen projects are indeed still "work in progress", there is still lots of idea to implement - judging from public tracking system "jira. Recently, Jira Service Management introduced a new type of project - Next-Gen project. Jira Work Management. Is there a way to avoid creating again all the stories, tickets and deadlines in this n. Click your Jira . So being able to organize the plethora of fields in a ticket is essential. If that's the kind of thing you want to do, I would suggest you use Classic Software projects to perform that function as they can use shared fields across those project types. Please kindly assist in. If you google it you will get to know more about bulk edit feature. If you use Jira Software Cloud, check out this article to learn about creating a next-gen Scrum or Kanban project. These next-gen projects are not compatible with Server and Data Center. The migration steps include creating a new project, migrating all issues, and resolving things on the go. Next-gen projects include powerful roadmaps and allow teams to create and update. If you want to create a server backup, contact support. Jira Work Management. Next-gen projects include powerful roadmaps and allow teams to create and update their issues. . I then select the destination Project and Status, and come to the screen where I tell it to Retain the values of all custom fields: However, in the next screen you can see that most of those fields are listed under both "Updated Fields" and "Removed Fields. 3. If you do choose to do this, keep in mind there would be an additional step because they are next gen projects, which do not exist on Jira Server. Jira Service Management ; Jira Work Management ; Compass ; Jira Align ; Confluence Trello ; Atlas. is itThere aren't really disadvantages to Classic projects at the moment. Yes, you are right. py extension and download the required " requests " module as its written in python. Next gen should really have this. Please let me know if there is a way out. Thanks for the patience guys, any requests/comments for Estimation related functionality should be made here. On the next-gen templates screen, select either Scrum or Kanban. Requirements: 1. bulk move is so clunky and time consuming; we need a bulk-move from within next-gen that works like next-gen does; in a classic project, to change an issue type, I could do this from within the issue screen by simply choosing the new issue type. After all the tickets were processed I wanted to check them in the new project. In classic projects, subtasks could be created from any other issue type whereas in next-gen subtasks can no longer be created directly under epics. Click the Project filter button and choose the project you want to migrate from. Click on its name in the Backlog. How can fields be added here? C. move all issues associated with an epic from NG to the classic project. The team currently works with a company-managed project but wants to move to a team-managed project because the project admin needs to make frequent changes to the project's workflow and fields without the dependency on Jira admin. My team still needs the fully fledge features of a classic agile jira project. Reply. I have administered Rally for 8 years, never used Jira, and want to understand real life pros/cons of using a Next-Gen or Classic Project. In the left sidebaser, choose Software development. Setup and maintained by Jira admins, company-managed projects will remain the best choice for teams who want to work with other teams across many projects in a standard way, such as sharing a workflow. Community Leader. I have read many articl. It seems like something that would save a lot of people discomfort/stress. In a nutshell, you'll have to create a new Classic project to receive your tickets, then query and (bulk) move the issues from you existing next-gen Project. Click create new Project. I'm not sure why its empty because this site is old (started at 2018). To create a backup for server, either: Bulk move important issues from next-gen projects into classic projects administered by schemes. you can't "migrate" precisely in that there is no 'button' to migrate. what we miss most in the nextgen project (beside different other minor functionalities): - Possibility to link issues in the epic from other classic Projects - Creating multiple filterbased boards. The Next-Gen is an individual project, designed to be more straightforward than the classic Scrum and/or Kanban template, with a single board, simple workflow and limited field options to be used at the issue detail view, this includes that issues from your Next-Gen project will only be available inside of that project, you. In Choose project type > click Select team-managed. Hi, I'm trying to move some subtask defined in a classic projecto into a next gen one. Share. You would then choose the 'move' option and move them to the same project (the classic one you are migrating to) but to the 'epic' issue type. Hi, I'm a little confused on how to add a subtask to an issue in a Next-Gen project. Click on Move. . Answer. Select the project roles for which you would like to grant access permission to the Issue Type and click Apply. And lastly, migrate data between classic and next-gen project. There is an option to create a project with a shared configuration that copies the settings from a project to another, but it. Released on Jan 18th 2019. Merging Jira instances – a company acquires another company. Portfolio for Jira next-gen support ;. The next-gen projects were created to be simple, so there is no option to edit the workflow to add more status or to add a screen to set the resolution. You're on your way to the next level! Join the Kudos program to earn points and save your progress. These would be the steps: Export your Next-gen issues by creating a query and using the option Export Excel CSV (All fields): Edit the CSV file: If your project: Has the You're in a next-gen project message in the bottom-left corner, and; Doesn't have the Group by dropdown in the top-right of the board, and; Doesn't have the Issue types and Features options in Project settings. Possible work around: 1. To try out a team-managed project: Choose Projects > Create project. Solved: I'd like to export all current stories from current next gen project into a newly created classic board. On the Select Projects and Issue Types screen, you'll need to select where the issues from your old project will go. Next-gen projects provide a streamlined experience, are easier to use, and quicker to set up than classic projects. For classic, the epic links are created from the 'Epic Link' field OR by dragging an issue card in the backlog on to an Epic in the 'Epics panel' (left sidebar): For Next-Gen projects, you are able to add Epic links (parents) from the dropdowns you are looking at AND from the breadcrumbs: Like. Create . The same story with sub-tasks, they are imported as separate issues. Ask the community . The functionality itself remains the same and. . Procurement, Renewals, Co-terming and Technical Account Management. Cloud to Data Center Project Move. (3 different projects) This fails as described above on every "next-gen" JIRA project I've tested with. Soon, when you create your next project in Jira, you will do so from a new template library, where you can browse a variety of different templates across all the Jira products you own (Jira Software, Jira Service Management, and Jira Core). I know a LOT of people have had this issue, asked. Create a next gen project; Move it to the Trash; Visit the Backup Manager PageClick the issue and click 'Task' in the top left in an attempt to convert the Task to a Subtask. - Next-gen project template does not support Zephyr Test issue type . So, in theory, if you use the Move Issue feature to move the issues to another project, and then update the board filter to reference that new. I have not tried that before, but you could give it a whirl. I then select the destination Project and Status, and come to the screen where I tell it to Retain the values of all custom fields: However, in the next screen you can see that most of those fields are listed under both "Updated Fields" and "Removed Fields. Migrate between next-gen and classic projects; As John said, you need to create a new project, it's not possible just to change the project type, so after that, follow the steps of the documentation. Create . Learn how they differ, and which one is right for your project. I do know that the team working on Jira Next-Gen regularly listen to Customer feedback. These are sub-task typed issues. Mathew Dec 18,. You can follow the steps of the documentation below to migrate from Classic to Next-gen. - Custom workflowsThought I should add a reference to the documented limitations of using Portfolio for Jira with Next Gen projects. I want to migrate next gen to classic type project. Ask a question Get answers to your question from experts in the community. Cloud to Cloud. In Step 3, choose which project you're sending these issues to, then press Next. I have been charged with setting up a project for a project for a fairly simple team migrating from Rally to Jira. Most of the power of the workflows is not there, even when you've got Automation added to it, you can only have one sub-task type, estimates do. Auto-suggest helps you quickly narrow down your search results by suggesting possible matches as you type. In the screenshot below, you can see the issue TNG-8 was correctly migrated to the Project TEST (Becoming TEST-18), however, the linked branch. I have inherited a project which was originally set up on a 'classic' JIRA board. I would recommend jumping on this thread in the Community to discuss if there is another type of report that you're looking for:. Only Jira admins can create. Fix version, can be tagged to release. Transfer Jira issues between instances keeping attachments and images. In short, the settings have been stripped back to a similar level to that of the Project Admin role in a classic Jira project – with some additional extras and, at least in Atlassian’s eyes, a more user-friendly layout. The current issue is that there is no way to map fields from the service desk project to the next gen. @Denis Rodrigues hi there! I see @Thiago Manini has pointed you to a solution. In the top-right corner, select more () > Bulk change all. I would like to move to a 'Next-Gen' board to take advantage of the additional functionality available - however, I don't want to lose sight of JIRA actions previously completed on the Classic board. Have 2 projects (Next-gen and non next-gen) Create an Epic from a non Next-gen project; Add a child issue to the epic; Move the epic to the next-gen project; Expected Result. You must be a registered user to add a comment. We are currently building projects on our cloud but will need to duplicate some of them on out Data Center instance as well that is currently being prepared and not up yet so we can't build them side by side. If you're a Jira. Hi @George Toman , hi @Ismael Jimoh,. Log time and Time remaining from the Issue View. Do read the Things to keep in mind if you migrate from classic to next-gen thoroughly before you make the move! You must be a registered user to add a comment. Ask the community . click on Create new classic project like in the picture below. Classic Boards: You can visualise Next-Gen projects on a. I've looked at: • moving issues • cloning issues and moving them • exporting issues to CSV and re-importing But in all scenario's data is lost,Solved: Hi Team, There is a need to move all the backlog items from next Gen project to classical Project. Epic link remains. We want to transfer all the Jira issues of a project from the Next Gen Cloud version to a server version. Thank you for mentioning Deep Clone for Jira, @Ismael Jimoh . greenhopper. Then I decided to start from scratch by creating a new project with the "Classic" type. I can't find export anyway, checked. . You'll need to ensure in the Next-Gen Projects you have a project role with the "Move Any Issue" permission, even if you're a Jira Admin. HTML format seems the best bet to do so. However, it seems it's only available in the Next-Gen projects whi. For simple projects which fit within Next-gen capabilities, it has been great. In Jira Software, cards and the tasks they represent are called “issues”. Have 2 projects (Next-gen and non next-gen) Create an Epic from a non Next-gen project; Add a child issue to the epic; Move the epic to the next-gen. 4. After that, you can move all your existing issues into the new project. Goodbye next-gen. Solved: Since you almost destroyed the tool with the new gen release, could you please provide a way to migrate our projects back to the previous. Hi All, I have a lot of projects in JIRA Software and they are in next-gen SCRUM UI. As part of the process, there are some custom fields we gather in the service desk that help us prioritize requests. Next gen project: 1. Depending on the complexity of the workflow on the classic you will need to map the status to the more streamlined next-gen but the Move will walk you thru it. Ah, I understand better now. . Nearly a year ago we launched the next-gen template, where we reimagined parts of Jira Software Cloud’s core functionality. Once you've completed the installation, you'll migrate your existing data between the databases, and then move your home directory and all existing customizations. 3. 7; Supported migration. Import was successful and both fields were preserved. Most data will not transfer between projects and will not be recreated see. Add the "Time tracking" field to an Issue Type in Next-gen Project settings. Click on "Bulk change all". Additionally, this is the official page with all the details you need to know in order to migrate your issues between Next-gen and Classic Jira projects: - Migrate between next-gen and classic projects . It's a big difference from classic projects, so I understand it can be frustrating. Ask a question Get answers to your question from experts in the community. Move them to the same project but the 'epic' typeThis Project has 5000+ Issues and I need to migrate it to our Production instance. Create and assign an issue to a particular fix version. The requirement is to measure team and individual velocity across all projects. The whole company is working within. Answer. Or, delete all next-gen projects and their issues outright. I am able to successfully upload the subtasks into a classic JIRA project. As you can see from the comparison table above, company managed project contains a little bit more advanced featured and little bit more advanced configuration. Click on the Disable Zephyr for Jira in Project XXX button. When I create a new project, I can only choose from the following next-gen templates. Create . Otherwise, register and sign in. Click your Jira . Select Projects. Start a discussion. The screenshot is a Next Gen project, and it shows RELEASES in the right sidebar. Ask the community . Yes, you can disable the. I have reached an impasse when I am requested to select the project I am moving to as well as t he issue types (see image below). Click on its name in the Backlog. Add the Sprint field to any screens associated with the project for issue types you want to add to sprints. Here's what I see as the important details. You can check the type of the project in the left sidebar: There’s a workaround if you still want to migrate data to the next-gen project. Edit a sprint in a company-managed project; Move or transition issues in an active sprint; Remove or delete issues from an active sprint;. You can select Change template to view all available company-managed templates. Need to generate User Story Map that is not supported by Next-Gen Project. Sprints: Portfolio doesn’t load sprints coming from next-gen boards. We’ve added a new card to the Jira Cloud Migration Assistant home screen that lets you migrate Jira users and groups before project data. Subtasks are enabled, and I do have the option to add a subtask to an issue in a classic project, but cannot figure it out in a Next-Gen project. This does not mean the end of classic Projects or the Jira Admin role for that matter. 2. Answer accepted. Products Groups Learning . You have to modify the originally created workflow by adding and rearranging columns on your board. Most data will not transfer between projects and will not be recreated see. So data in those fields will be lost. Start a discussion Share a use case, discuss your favorite features, or get input from the community. Additionally, if you really need the ability to bulk move issues from backlog to a Next-gen Kanban board, I Suggest you two possible workarounds: 1 - Navigate to the project settings > Features > Turn-on Sprints for your project. . Hi I used JIRA Service Desk cloud for free planning, the question is my JIRA Service Desk template for Next Gen is empty. Hello. You will see the same Sprint and Issue in the classic project board. Details on converting the project is covered in the documentation at "Migrate between next-gen. Hope this helps! You must be a registered user to add a comment. In Jira Server or Data Center go to Settings > Manage apps. Ask a question Get answers to your question from experts in the community. Workflows are meanwhile available for next-gen projects. Are there any future plans to allow the migration to the next-gen board? We plan on closely tracking the added features listed on the next-gen roadmap and seeing if the solution fits our use case. For example, I have two different Next Gen projects with project keys: PFW, PPIW. Use Jira Cloud mobile to move work forward from anywhere. 2. @Mark Bretl Thanks for surfacing that feedback around Advanced Roadmaps + next-gen. Classic provides an option to setup a simplified status label for the customer's view, while Next-gen does not. 1. But they all seem to be disappeared. Select whether you want to delete or retain the data when disabling Zephyr for Jira. Select Projects. - Add the statuses of your next-gen issues to the columns of your board. Search for jobs related to Migrate to jira next gen project or hire on the world's largest freelancing marketplace with 23m+ jobs. For more information on global permissions, see Managing global permissions. Hello, I'm switching our project from Next Gen to Classic. This script allows you to migrate a classic project to next gen project in a automatic way while preserving all the information. However, I see this feature is only available for next-gen software. If you use Jira Software Cloud, check out this article to learn about creating a next-gen Scrum or Kanban project. 4. For this case I have one question in. It's free to sign up and bid on jobs. Start a discussion Share a use case, discuss your favorite features, or get input from the community. Then, import your data to the classic project. We have a classic project with a lot of issues with subtasks. Yes, you are right. Hi @Neil Timmerman - My understanding is that all issues in the classic project will end up in the backlog. Ask a question Get answers to your question from experts in the community. Solved: Hi I have two instances of Jira cloud and I wish to migrate my next gen project from one instance to another So I complete the jira inbuilt. Ask a question Get answers to your question from experts in the community. then you have an old Agility project, and it will be converted to a classic project after June 10. Having Company Managed (previously known as Classic) projects and Team Managed (previously known as Next Gen) projects in one Jira instance is possible only when you are using Jira Cloud. A project is started there as an experiment. The classic project has a filter to show issues from both projects and when I use that. In short, the settings have been stripped back to a similar level to that of the Project Admin role in a classic Jira project – with some additional extras and, at least in Atlassian’s. Now I need to know how to migrate back to classic project to get all those things back. Features for next-gen projects are indeed still "work in progress", there is still lots of idea to implement - judging from public tracking system "jira. Next-Gen still does not have the required field option. I couldn't find the next-gen template when trying to create the new service desk, and. Support for project categories: Assigning categories to next-gen projects now works the same way as classic projects. Here's a few things to consider when you migrate from a classic software project to a next-gen software project: Active sprints: Sprints in progress in your classic project won't move to your next-gen project. Server to Cloud. 1. I have already switched from next-gen projects to classic projects because I'm tired of bugs, imperfections and missing functionality, now I have no problems. Can export the issues. It's free to sign up and bid on jobs. Migrating from Halp to Jira Service Management. Solved: I have two classic projects set up. On the Select destination projects and issue types screen, select where issues from your old project will go. Products Groups . I'd suggest you to read the documentation before bulk move the tickets between projects: Migrate between next-gen and classic projects The only way to convert next-gen project to a classic project is to create a classic project and move all issues from the next-gen project to the this classic project. " So, currently there is no way to create a custom field in one project and use it in another. When evaluating a third-party migration tool, consider the following criteria:Next-Gen has features you can turn on or off to move between Kanban and Scrum. Your project’s board displays your team’s work as cards you can move between columns. There is no such a concept of next-gen projects in Jira Server. For example, I have a rule that says that a story cannot move from To Do -> In Development when the "Requesting Customer" dropdown is blank. The problem is that the two projects will have different workflows and not a part of the same workflow scheme. Startup the script and follow the prompt to correct the Epic Links in your next-gen Projects. We are 4 teams that would need a joint roadmap but the mix of old and new teams coming together as one 'valuestream' means that 2 teams are workin. Project Administrator: A Project administrator, as we mentioned before, can change project settings and roles, assign members to groups, and enable or disable specific features.